The building for a former motel at 1024 South Washington was demolished some time ago, but there is still work to be done at the site. There is an empty lot with a wall, scrap metal from the motel, a basement and pool site that must be dealt with.
The Junction City Commission has authorized staff to solicit bids for the demolition work at the site.